Checking Cable Guards

1. Make certain all parts are installed correctly on machine. Check cap screws (A) and locking nuts (B) to make sure they are tightened to proper torque.

2. Prior to checking cable tension, align machine and install locking pin.

causym CAUTION: Cable guards are spring loaded. Use care when removing.

3. Check cable guard (C) for wear and damage, replace as necessary.

4. Check cable tension for proper operation.

T103782


A-Cap Screw (2 used)
B-Lock Nut (2 used)
C-Cable Guard (2 used)

TX,90, DY2095 -19-23FEB00-1/1